National Building Regulations
Part A. Administration

To select a section, select the down arrow and select a choice from the list.

A5. Application Forms and Materials, Scales and Sizes of Plans

  1. Any application form shall be dated and signed in black ink by the owner.

  2. Any application shall be accompanied by at least one set of plans, drawings and diagrams which shall -

    1. be clear and legible;

    2. be drawn on any suitable material or be provided in a medium acceptable to the local authority;

    3. contain the name of the owner of the site concerned; and

    4. be dated and signed in black ink by the owner; and every subsequent alteration shall be likewise dated and signed.

  3. Any application shall be accompanied by as many additional copies of every plan, drawing or diagram as required by the local authority.

  4. Such plans, drawing, diagrams, and any copies thereof, shall be on sheets of the A series of sizes or multiples of A4.

    1. Plans, drawings and diagrams shall be drawn to a suitable scale selected from one of the following scales:

      1. Site plans:
        1:1 000, 1:500, 1:250, 1:200 or 1:100.

      2. Plumbing installation drawings:
        1:200, 1:100 or 1:50.

      3. Layout drawings:
        1.100,1:50 or 1:20: Provided that in the case of elevations 1:200 may be used.

      4. General structural arrangement drawings and structural details:
        1:100, 1:50, 1:20, 1:10, 1:5, 1:2 or 1:1.

      5. Fire protection plans:
        1:200, 1:100, 1:50 or 1:20.

    2. The local authority may accept a scale not provided for in this sub-regulation.

  5. One copy of the plans and drawings contemplated in subregulation (2) shall, for the convenience of the local authority, identify in a suitable manner or colour the following as indicated below:



    1.   Material Colour
      (in plan or section)
      i New Masonry Red
      ii New concrete Green
      iii New iron or steel Blue
      iv New wood Yellow
      v New glass Black
      vi Existing materials
      (all materials)
      Grey
      vii All other new materials To be clearly indicated in colours other than the above.

    2. SITE PLAN

        Material Colour
      i Proposed work Red
      ii Existing work Not coloured
      iii Work to be demolished Drawn with black dotted lines

    3. DRAINAGE INSTALLATION CONTEMPLATED
      in regulation A2(1)(d)

        Material Colour
      (in plan or section)
      i Drains and soil pipes Brown
      ii Waste pipes Green
      iii Soil and combined vents Red
      iv Waste vents Blue
      v Pipes for the conveyance of industrial effluent Orange
      vi Existing drains Black
      vii Stormwater drains Not coloured

  6. The escape route drawn on any fire protection plan shall be coloured green and the direction of travel to a safe area shall be indicated by arrows drawn at short intervals along the plan route.

  7. In all cases the scales employed shall be stated on the plans and drawings, and the letters and symbols used on such plans and drawings shall be not less than 2.5 mm in size in the case of upper case letters.